Past projects
 |
Project: Assassa Assabo Uplift Project
Client: Exxon/Mobil Producing Nigeria Unlimited (Exxon/MPNU)
Project Award - 2004
Project Completion - Ongoing
Engineering, procurement and fabrication of 12 miles sub-sea 12” crude oil and 20” gas pipeline with Pig launcher and receiver. Complete with valve stations, instrumentation and commissioning for Mobil Producing Nigeria. |
|
 |
Project: Eastern Gas Gathering System (EGGS)
Client: Shell Petroleum Development Co. Nigeria Ltd. (SPDC)
Project Award - 2003
Project Completion - Ongoing
Engineering, procurement and fabrication of 83 Km of 600 ANSI, 40-inch gas pipeline from at tie-in and 44-inch launcher at Soku Gas Plant to an existing receiver at Bonny NLNG Terminal, including a 3.5 Km 12-inch spur line from the Cawthorne Channel Gas Plant to a tie-in on the 40-inch. The entire 83 Km of pipe was coated with 3-layer polyethylene corrosion coating and 190 #/ft3 concrete weight coated. Six major rivers were crossed, including a dual (40" & 36") 6 kilometer crossing of the Bonny River. |
|
 |
Project: Chad-Cameroon Oil Development and Pipeline Project
Client: Esso Exploration & Production Chad, Inc.
Project Award - 2000
Project Completion - 2003
Engineering, procurement, and construction contract for a 30” pipeline system to transport oil from southern Chad through neighboring Cameroon to the Atlantic coast for export to world markets.
|
|
 |
Project: Akono and Erong North Development Project
Client: Pecten Cameroon Company
Project Award - 1998
Project Completion - 1998
Engineering, Procurement, installation and commissioning of surface facilities and associated pipelines to develop the Akono and Erong North Fields, both offshore Cameroon. Facilities consisted of two, three-leg, fourslot jackets and decks and an 8 and 10” pipeline to connect newly installed platforms to existing production infrastructure. Project duration was approximately seven weeks and was completed in September 1998.
|
|
 |
Project: 36-Inch NLNG Pipelines
Client: Saipem S.p.A.
Project Award - 1997
Project Completion – 1998
Construction services in conjunction with the Nigerian LNG Project in Bonny, Rivers State for the 20-mile, 36-inch swamp pipeline, including a 1.6 mile crossing of the Bonny River and a scraper trap inside the Bonny NLNG Plant for export. It was the largest single gas project in Nigeria.
|
|
 |
Project: Trans-Niger Pipeline Replacement
Client: Shell Petroleum Development Company of Nigeria Limited
Project Award - 1992
Project Completion - 1994
Fabrication and installation of 36-inch pipeline with scraper traps from Rumuekpe to Bomu. The scope also included modifications to 11 manifolds and hot tap tie-ins to the Trans-Niger Pipeline.
|
|
 |
Project: Rabi to Gamba Crude Pipeline
Client: Shell Gabon
Project Award - 1988
Project Completion - 1989
Procurement, construction and pre-commissioning of a 76-mile, 18” crude oil pipeline with scraper traps, valve stations, instruments, and a cathodic protection system for the development of a major oil field in the interior of the Republic of Gabon. The system also involved 59 miles of 4, 8, 10, and 12” flowlines, including 6 miles of swamp work and a total of 11 miles of river crossings, one of which is the 36” crossing of the Ossiomo River.
|
| |
|
| previous past projects |
to the top |
| |
|
| |
|