Projects

Current projects
Past projects
 
   
Home > Projects: Past projects
 

Past projects

Project: Subsea and Accommodation Contract
Client: Addax Petroleum Development Company of Nigeria Limited

Project Award – 2008
Project Completion – 2009


A subsea technology support project with Addax in in OML 123 offshore the Calabar Adanga Complex in Cross River State. The Ascot Brass 1 was employed for this work.



Project: 12” and 14” pipeline and associated Closing Spools
Client: Addax Petroleum Development Company of Nigeria Limited

Project Award – 2008
Project completion – 2008


The project was awarded to Ascot as a sub-contract from Maritimex Offshore Nigeria Limited and the work scope was in two phases: Ascot completed the 10.57 kilometre offshore 12” pipelay work for the Addax OML 123 field offshore Calabar in Cross River State in July 2008. The work included a very tricky maneuver past the Knock Adoon FPSO. The next phase was the the completion of a 15 kilometre offshore 14” pipelay work for the same Addax OML 123 field. The Ascot Forcados 1 was employed in a Lumpsum Contract to undertake both 12” and 14” pipelay projects. Immediately after the Pipelay, Ascot commenced another project for Addax which was the pulling of two pipeline spools with a length of nearly 234m.


Project: Land Reclamation, Ogulagha, Delta

Project Award - 2008
Project Completion - 2008


Oghulaha is the nearest land mass to the Forcados Terminal. The work scope involves the initial survey of Site / borrow pit (to be conducted with jointly with the Client), clearing of all bush, scrubs, grass and trees from site, provision and installation temporary pipes for dewatering, construction of bund walls to retain the fill material; also, the pumping of 900,000 cu.m (Nine hundred thousand cubic meters) of sand from the adjourning river/creeks and the final survey of Site / borrow pit (to be conducted with jointly as well with the Client).


Project: Project Services Contract for the MPNU Edop-QIT Pipeline Clamping Project
Client: Mobil Producing Nigeria Unlimited (ExxonMobil/ MPNU)

Project Award - 2008
Project Completion –
2008

A call-out contract with ExxonMobil/MPNU for the Edop-Qua Iboe Terminal (QIT) Pipeline Clamping Project. The initial scope of work involved the provision of a supply vessel and also the supply of a Crew Boat (surfer) to the project site; Ascot also handled the required logistics for her vessels as well as other contractors’ vessels for the duration of the project (viz.: provision of fuel, food, water and crew change). The contract is a joint project with another contractor - RUE (also known as Omak Maritime Limited) to install 49 clamps on the Edop to QIT 24" pipeline.


Project: Addax OML123 Time Chart Accommodation Services
Client: Addax Petroleum Development Company of Nigeria Limited

Contract Award – 2007
Contract End Date – 2008


A contract with Addax Petroleum for the Ascot Brass 1 in time-chart and accommodation services to Addax for a minimum of 90 days.


Project: OML123 Installation Contract
Client: Addax Petroleum Development Company of Nigeria Limited

Project Award – 2007
Project Completion –
2007

A subcontract from Maritimex Offshore Nigeria Limited to install 10.57km of 12” pipeline in Addax’s OML-123 field located offshore Calabar; the ultimate client on this assignment was Addax. The execution of this work was a milestone event for Ascot in that it signified the volume of Ascot’s work in the offshore Nigerian market. The Ascot Forcados 1 and the Ascot Bonny 1 vessels were engaged to conduct this work.

   
more past projects to the top