Service areas - Fabrication
Ascot operates two fabrication sites at its Site 1 Choba Facility and a main Fabrication Site at its Site 2 Fabrication Facility (Isiodu) in Port Harcourt.
| Structural Fabrication: |
Jackets
Platform Decks
Heli-decks
Boat Landings/ Jetties
Flare Bridges
Sub-sea Modules
Piles
Platform Deck Extensions
Associated Structures (i.e. Stairways, Ladders, Handrails, Pipe Supports, Brackets, Braces, Gussets, etc.)
Remedial/Retro-fitting Work on Existing Platforms/Structures
New Platforms / Manifolds / Wellhead Decks
Deck Extensions
|
 |
| Piping Fabrication (Carbon and Stainless Steel Capacity): |
Above-deck Process Piping
Sub-sea Process Piping
Skid-based Manifold Units
Double- and Quad-Jointing (Linepipe)
Below-deck Process Piping
Mainline Pig Launchers, Receivers, and associated Piping
Remedial/Retro-fitting Work on Existing Manifold Skids/Piping Spools/etc
Blasting and Painting Services
Pressure / Leak Testing
Pre- and Post-process Heat Treatment |
 |
Full Complimentary Blasting and Painting Facilities
Pressure / Leak Testing
Sub-sea (Concrete) Mattress Construction
Pre- and Post-process Heat Treatment |
 |
SPM Buoy Repair
Remedial/Retro-fitting Work on Existing Platforms/Jackets/etc
Remedial/Retro-fitting Work on Existing Manifold Skids/Piping Spools/etc
Anode Installation on Offshore Structures
Blasting and Painting Work |
 |
| Site 1 : |
Ascot’s Choba Base Facility is located approximately 40-km northwest of Port Harcourt, just off the East-West Road near the intersection of Choba-NTA Road (Uni-Port Junction)
Ascot operates three separate yards known as “Site 1”, “Site 2”, and “Site 3”. Sites 1 and 2 are separated by the New Calabar River and can be reached by either road or water. Site 2 is within a line-of-site across the river from Site 1. Ascot’ Site 3 Yard is located approximately 3-km down East-West Road from Site 1, and 1.5-km down East-West Road from Site 2
Ascot’s Yard at Site 1 is approximately 76 acres in size, with over 500 meters of usable water frontage
The back of Ascot’s Site 1 Yard faces the New Calabar River and provides access to all the major inter-coastal waterways
Ascot’ Marine Jetty at Site 1 is sheet piled to a length of approximately 100 meters and has a usable draft of 5 meters for ease of performing load-in, load-out, and other marine services
860m2 covered Fabrication Facility with One Overhead Crane (10T)
Other covered Fabrication Facilities Total 1,440m2
785m2 open Fabrication Facilities (i.e. Fabrication Racks)
One Surface Blasting and Coating Facility with Two covered areas (295m2)
Cranage capacity is 17 - 150T, as well as multiple-crane lifting capability
Pressure / Leak Testing Capability
General and Project Material Warehouses
Light- and Heavy-Duty Mechanical Shop Facilities
Machine Shop
Offices, Messing, and Accommodation Facilities
Medical Clinic
Sign-painting Shop (HSE Signs)
|
 |
| Site 2: |
Ascot’ “Site 2” location is located in the same approximate location as Site 1, on the opposite side of the New Calabar River
The back of Ascot’ Site 2 Yard also faces the New Calabar River and provides access to all the major inter-coastal waterways
Site 2 Yard is approximately 88 acres in size, with over 160 meters of usable water frontage
Ascot’ Marine Jetty at Site 2 is sheet piled to a length of approximately 60 meters and has a usable draft of 6 meters
Two surface coating facilities
2,600m2 Fabrication Facility with Two Overhead Crane (30T each)
Pile Rack with Submerged Arc Welding Facility
Multiple temporary weather shelters
Subsea (Concrete) Mattress Manufacturing Facility
Cranage capacity is 17 - 200T, as well as multiple-crane lifting capability
Hard-standing location for Construction and Testing
Various Project/Client Offices and Conference Rooms
General and Project Material Warehouses
On-Site Medical Clinic
Dedicated Helicopter Landing Pad on site |
 |
|